web www.nwrenovation.com

DOWNOAD YOUR
FREE COPY OF
BUILDING GREEN

CLICK HERE

Step 1 (no photo)
Cut two pieces of plywood two feet by four feet and place in a safe place. When using power equipment always wear safety glasses and never wear loose clothing and a long sleeve shirt.
Raw material used for this project are:
Five 8’-2X4’s (construction grade)
Two 2’X4’X1/2” pieces of plywood
One pound box of 1 5/8” deck screws
One pound box of 3” deck screws
  Step 2
Start with the legs. Mark one of the 2X4’s to 34” and then cut all legs. Mark and cut the four side stretchers to 24” and the four front stretchers to 45”.
Step 3
Cut all the stock to length and set aside. If using a hand saw for this step make sure that legs are cut straight because you want them to sit level.
Step 4
Mark all four legs six inches from one end. Use this line to line up the two front stretchers that holds the bottom shelf.
Step 5
Lay two legs and one front stretcher on the floor. Use the Speed Square to square all legs and stretchers.

(1) (2) (3) (4)











ARCHIVES
| ABOUT NWR | ADVERTISE | CONTACT NWR MAGAZINE | ADVERTISER LINKS | HOME

Copyright 2002-2008 Twenty First Avenue Publishing LLC, All rights reserved.
Reproduction of this site, in whole or in part, is prohibited unless authorized in writing by the publisher.


Legal and Privacy Information